What was broken

An industrial company designs custom technical projects for large clients.

Every project needs drawings and a bill of materials. A team of drafters rebuilt each design by hand, from drawing to parts list, copying from one tool to the next. It was fixed-rule work that ate most of their hours and capped how many projects the company could take on.

What they built

We built a system that generates the design and the bill of materials from the project requirements. We turned the design team’s know-how into rules the system applies. Engineers now review and approve each design instead of drawing it. The same team turns out twice as many projects, which frees up about 7 FTE of design work (estimated), and quotes go out faster.

What changed
2x design output with the same team, about 7 FTE of drafting freed up.
Time to results
4–8 weeks
Company size
51-250 people
Project cost
Under $25K
Runs on
Claude (Anthropic), Open-source / self-hosted, Multi-model
More solutions like this

See all 50 solutions for product and engineering teams

Proof of Work, weekly

New solutions every week, and the case studies behind them.

Our newsletter. What got built, what it changed, who did it. No pitches.