SolvedReceipt · Shared by the builderReceipt no. 0410
What was broken
An industrial company designs custom technical projects for large clients.
Every project needs drawings and a bill of materials. A team of drafters rebuilt each design by hand, from drawing to parts list, copying from one tool to the next. It was fixed-rule work that ate most of their hours and capped how many projects the company could take on.
What they built
We built a system that generates the design and the bill of materials from the project requirements. We turned the design team’s know-how into rules the system applies. Engineers now review and approve each design instead of drawing it. The same team turns out twice as many projects, which frees up about 7 FTE of design work (estimated), and quotes go out faster.
What changed
2x design output with the same team, about 7 FTE of drafting freed up.
- Time to results
- 4–8 weeks
- Company size
- 51-250 people
- Project cost
- Under $25K
- Runs on
- Claude (Anthropic), Open-source / self-hosted, Multi-model
More solutions like this
- How Jewelbench Cut Jewelry CAD Modeling Time by 95%Ideas2IT Technologies · Manufacturing & Industrial
- How Superintelligent Interviewed 150 Staff for $500 With AIFractional AI · Technology & Software
- How Walmart Cut 18 Weeks From Fashion Design-to-ShelfHuman Machines Group LLC · Retail & E-Commerce
- How a Legal Tech Firm Won Back 7-Figure ARRBonsai Labs · Legal & Compliance