A growing construction company needed to increase its tendering capacity, but experienced estimators were difficult to hire and the existing team was tied up in manual preparation.
Each bid required piecing together information from historical estimates, subcontractor quotations, emails and revised tender documents. Estimators had to find comparable work, interpret complex line items, build up costs, compare quotations for the same scope and carry pricing decisions through successive document versions. The company had accumulated valuable knowledge about prices, suppliers and previous projects, but that knowledge was scattered across spreadsheets and individual experience. Reusing it depended on knowing which project to look for and who remembered the relevant details. This fragmented workflow consumed time that the team needed for evaluating risk, negotiating prices and making commercial decisions. It also made increasing bidding capacity heavily dependent on adding experienced staff. For one reported estimate containing around 200 line items, preparation required approximately 40 hours.
We built an integrated AI-assisted platform for construction estimating and tender preparation, connecting historical project knowledge, resource-based cost calculations and subcontractor quotations in one workspace. The system imports Excel tender documents, structures their line items and retrieves relevant pricing from previous projects. Estimators can review suggested prices alongside their sources, adjust recommendations and reuse the company's accumulated pricing knowledge across future tenders. For detailed costing, the platform supports unit-rate calculations based on labour, material and equipment consumption rates. Estimators can inspect and adjust quantities, productivity assumptions, resource prices and overhead or markup factors to build an explainable price for each item. Potential scope overlaps are surfaced for review. Subcontractor quotations can be imported and compared side by side for the same scope of work. The team can see price differences and unquoted items, select prices item by item and incorporate those decisions into the final estimate. This brings historical benchmarks, calculated costs and actual subcontractor quotes into the same decision process. The workflow connects tender intake, pricing, quotation comparison, review and final Excel export. Estimators retain control over pricing and commercial decisions, with the supporting evidence and calculations available in the workspace. For the reported 200-item estimate, preparation time fell from approximately 40 hours to 8 hours, around 32 hours saved, or an 80% reduction.
- Time to results
- Under 4 weeks
- Company size
- 51-250 people
- Project cost
- $25K – $100K
- Runs on
- Multi-model