What was broken

A PE-backed heavy civil contractor (~$600M revenue) maintained a ~600-unit fleet on OEM calendar and hour-meter intervals.

About 450 unplanned failures a year each stopped a machine on site and idled a crew while parts were sourced, at roughly $25K a day all-in. Six years of work orders sat unstructured in the ERP, and telematics fed a dashboard nobody opened. The sponsor's plan called for margin expansion without capex, and equipment availability was the binding constraint on how many jobs could run at once.

What they built

We built a predictive model on six years of work order history, live telematics (engine hours, fault codes, fuel burn, idle ratio, load), parts inventory and technician diagnostic notes. It scores each unit's failure probability, names the five parts the repair will most likely need, and ranks the work against the job schedule and shop capacity. The output is a weekly risk-ranked queue inside the existing ERP work order screen, with parts pre-order triggers on high-risk units. The fleet manager approves the queue before anything is scheduled; the model recommends and never dispatches. A five-person team scored the first 120 units in six weeks, had all four shops on the queue by week nine, and reached full production in 16 weeks on an $850K build. Average downtime per failure fell from ~4 days to ~1. Emergency parts and expedite spend dropped from ~$1.4M to ~$0.9M a year, and ~78% of flagged jobs are now actioned inside the window, worth ~$33M a year at full fleet capture.

What changed
Downtime per equipment failure cut from ~4 days to ~1 across a ~600-unit fleet
Time to results
2–4 months
Company size
1,001-5,000 people
Project cost
$500K+
Runs on
Microsoft Azure / Azure OpenAI, Custom / proprietary
More solutions like this

See all 105 solutions for operations

Proof of Work, weekly

New solutions every week, and the case studies behind them.

Our newsletter. What got built, what it changed, who did it. No pitches.