Case study · From the Pluris libraryReceipt no. 0177
What sucked

A global automaker was losing $50M a year to unplanned equipment failures.

Scheduled maintenance was either too frequent, wasting 30% of the budget on healthy machines, or too late, causing cascading line shutdowns. 10,000+ sensors were generating data nobody was acting on.

Manufacturing & IndustrialOperations6–12 months
What they built

An edge-AI predictive maintenance platform that reads 10,000+ sensors across 12 plants to predict equipment failure 48–72 hours out, with prioritized alerts and digital twins.

What changed
$12M Annual Savings

Avoided emergency repairs and downtime.

15% Less Downtime

Reduction in unplanned production loss.

94% Prediction Accuracy

On critical equipment, 48–72h before failure.

Time to results
6–12 months
Company size
5,001+ people
Project cost
$500K+
More fixes like this
Who did it
Dean Sloves
Founder, Bolt Group